Ibtikar Fireproofing
  • Home
  • About Us
  • Services
    • Intumescent Paints
    • Cementitious Paint
    • Wood Fire Retardant
    • Fabric Fire-Retardant
    • Cable Protective Coating
    • Epoxy Intumescent
    • Solvent Intumescent Coating
  • Projects
  • Careers
  • Contact us
  • Search
  • Menu Menu
  • LinkedIn
  • Facebook
  • WhatsApp

89

Hours of Work

July 2022

Project Date

1,850 Sq m

Surface Area

Steel Structure

Apply on

Jotun SteelMaster 600WF

Material

DUBAI INTERNATIONAL AIRPORT
DUBAI INTERNATIONAL AIRPORT

About Dubai International Airport Expansion

Al Ibtikar Al Hadeeth Technical Works is the leading fireproofing company in the UAE, offering top-notch fireproofing services to protect steel structures from fire damage. We use advanced fireproofing materials such as intumescent paint and cementitious fireproofing to ensure that structures remain safe for up to 120 minutes during a fire outbreak. Our company has completed numerous projects in the UAE, with each project having a unique story. One of our significant projects was the DUBAI INTERNATIONAL AIRPORT EXPANSION, where we fireproofed 1850 square meters of steel surface using Sherwin-Williams Phoenix 370-90 and Sherwin-Williams Phoenix 370-60. The project was completed in 2022, and it was located at the Al Maktoum International Airport in Dubai. Our fireproofing solutions are optimized for search engines with keywords such as fireproofing, intumescent paint, fireproofing contractors, fire-resistant coatings, flame retardant treatments, passive fire protection, and fireproof insulation, among others. Trust Al Ibtikar Al Hadeeth Technical Works for the best fireproofing services in the UAE.

Jotun SteelMaster 600WF

Fire Proofing Materiel: Jotun SteelMaster 600WF

Jotun SteelMaster 600WF is a waterborne intumescent coating and specially formulated to offer 60 minutes sustainable fire protection for structural steel applications without the need for excessive coats. This makes it the most cost-effective fire protector for safeguarding the integrity of steel structures in fire situations. It is suitable for steels exposed to internal environments up to C3.

  • Jotun SteelMaster 600WF Application guides
  • Jotun SteelMaster 600WF Safety Data Sheets English
  • Jotun SteelMaster 600WF Safety Data Sheets Arabic
  • Jotun SteelMaster 600WF Technical Data Sheets

  • Engineered for a better environment
  • The most competitive waterborne fire protection product
  • Waterborne
  • Ideal for cost-effectively lowering VOC output

  • Fire protection coatings Building – interior
  • Intumescent coatings – cellulosic fire
  • Interior steel protection coatings – buildings

Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
89

Hours of Work

July 2022

Project Date

1,850 Sq m

Surface Area

Steel Structure

Apply on

Jotun SteelMaster 600WF

Material

Contact Us

+966550442177

inquiry@ibtikar-saudi.com

The Kingdom of Saudi Arabia
Al Olaya, Riyadh 7115, Saudi Arabia

 

 

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           Closed
Saturday       8 AM – 5 PM
Sunday         8 AM – 5 PM

Latest Projects

  • AMAZON
    AMAZON FULFILLMENT CENTERin: Intumescent Paint
  • FEDEX
    FEDEX SORT AND CLEARANCE FACILITYin: Cementitious Paint, Intumescent Paint
  • Jasmine Lane by Elie Saab
    Jasmine Lane by Elie Saabin: Cementitious Paint
  • RSA Cold Chain
    RSA Cold Chainin: Intumescent Paint

Our Offices

Ibtikar Fireproofing Offices

-Riyad, Al Olaya

-Dubai, Silicon Oasis

-Abu Dhabi, Mussafah M 45

-Sharjah, Al Musalla

-Ras Al-Khaimah, Al- Salihia Tower 303

-Umm Al Quawain, Umm Dera

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • LinkedIn
  • Facebook
  • WhatsApp
ELEVATORS FOR PEDESTRIAN BRIDGES IN DUBAIIBTIKAR FIRE PROTECTION_P-15-ELEVATORS FOR PEDESTRIANMain Pictire-Souq Al HarajSouq Al Haraj Phase 3
  • العربية
chat on whatsapp Scroll to top